Skip to content
Asta Powerproject Training background

Asta Powerproject Training

Our specialist trainers (ex-Asta staff) have an unrivalled 24 years of delivering Powerproject training within the construction industry.  This training expertise and real life experience is a great value add to any training with plenty of insights on best use practice.  This comprehensive knowledge and capability has helped shape the design of our Asta Powerproject training courses to enable delegates to create professional looking project plans quickly.

Consultancy and Template design services are also available and are totally aligned to our client’s unique needs.  Also popular are our tailored workshops (using clients actual data) which boost  user productivity.

Courses are delivered onsite (at your offices, UK wide) or live online, and all content can be totally tailored to suit the way you work with the product.

Asta Powerproject training is available for ALL product versions and to all knowledge levels including the NEC contract.

We now also offer ½ day bite size sessions!!

 

Asta Powerproject Training logo

Powerproject Introduction course

1 day

Asta Powerproject is a professional project management tool aimed at the construction industry.   It helps construction companies create plans, and manage projects, costs and resources.   This practical Asta Powerproject Introduction course teaches the basics of project management from initial project set-up to progressing and managing tasks and rescheduling.

Courses are delivered by our team of ex-Asta staff who have an unrivalled 24 years of delivering Powerproject training within the construction industry!

Download PDF Book now

What will you learn?

By the end of this Asta Powerproject Introduction course, attendees will be able to:

  • Create and manage a basic project
  • Enter tasks and durations
  • Add milestones and summary tasks
  • Link tasks and show the critical path
  • Format the Bar Chart display
  • Manage the progress of tasks
  • Print the project plan

Audience?

This Powerproject course is designed for site managers and project managers and would also benefit anyone needing to create or update a basic project plan.

Course Contents

Getting Started

  • Screen familiarisation
  • Ribbon v Toolbar mode
  • Changing Time Line display

Creating a New Project

  • Creating a project with a template
  • Entering project information

Calendar

  • Setting the default Calendar
  • Setting exceptions in the Calendar

Creating a Linked Bar Chart

  • Entering Tasks
    • Entering tasks and durations
    • Move/Insert/Delete tasks
    • Marking project milestones
    • Updating tasks
    • Multiple tasks on one line (Split/Merge tasks)

Critical Path Analysis

  • Adding Links
  • Linking tasks and rescheduling
  • Critical Path and Float
  • Show/Hide the critical path
  • Working with Constraints e.g. Constraining tasks to specific dates
  • Setting Lead and Lag time
  • Changing the Project start e.g. date
  • Working with the Datezone

Creating Project Structure

  • Creating summary tasks
  • Showing and hiding sub-tasks

Formatting

  • Display switches to show/hide chart elements
  • Displaying different task data on the Bar Chart
  • Formatting the task detail
  • Adding textual annotations

Creating Code Libraries

  • Creating new code library entries
  • Applying code libraries
  • Basic task Filtering

Basic Progress Entry

  • Adding columns to the table
  • Entering progress
  • Setting a progress date
  • Displaying a progress line
  • Connecting text boxes to bars

Printing

  • Setting print options
  • Setting a border file
  • Using print preview
  • Adding project properties

Course Materials

Enliten IT will provide each delegate with a workbook and other useful reference materials where applicable.   These may be either paper based or in Adobe pdf format or a combination thereof.

“"Probably one of the best course I have attended.  Trainer presented very well in a great manner which helped greatly."

 ”

Matt, Castle Building Services, Powerproject Introduction

Prerequisites

No prior knowledge of Asta Powerproject or project management is assumed.

 

Additional Information

NOTE:  We only offer this Asta Powerproject Introduction course on a private in-house basis.  For pricing and availability just pick up the phone and call us on 0845 1085481.

Enliten IT reserves the right to modify course content and materials as required in the interests of continuous course improvement, at any time, without notification.

The suggested course duration is a guideline.   Course topics and duration may be modified by the instructor based upon the knowledge and skill level of the course participants.